The customer removed all materials from the bathroom down to the studding and subfloor. The floor was reframed to accept a Jacuzzi tub and supported down to the basement floor to give the proper bearing for the weight. Marble flooring was installed with the corners cut to allow for small red glass tiles to be laid at all the corners.
Click to enlarge image.